Bui Quang Linh, & Nguyen The Quan. (2026). Design-to-cost in construction project cost management: A conceptual review and structural limitations. JOURNAL OF MATERIALS & CONSTRUCTION, 16(01). https://doi.org/10.54772/jomc.v16i01.1304