Analysis of affecting factors on construction quality during the execution phase: A case study in Can Tho city

Nguyen Anh Thong , Ho Thanh Sang , Lam Anh Gan , Lam Tan Phat , Tran Van Ty

Abstract

This study identifies and assesses the factors associated with construction quality during the execution phase in Can Tho City, Vietnam. A measurement scale was developed based on a literature review and consultation with 20 experts, followed by a questionnaire survey of 195 construction professionals. Data were analyzed using Cronbach’s alpha, Exploratory Factor Analysis (EFA), and multiple linear regression. Of the initial 36 observed variables, two were removed during reliability testing and five during EFA, leaving 29 variables grouped into six factors. The regression model explained 70.3% of the variance in the construction-quality assessment score. Based on standardized β coefficients, the factors were ranked as follows: project owner (β = 0.317), design (β = 0.201), construction supervision (β = 0.177), contractor competence and site organization (β = 0.146), contractor quality management and construction compliance (β = 0.135), and construction materials (β = 0.104). At the item level, the professional competence of supervision consultants received the highest mean score (3.54 out of 4). The findings provide an empirical basis for prioritizing construction-quality management measures in Can Tho City.

References

  1. Government of Vietnam, “Decree No. 207/2026/ND-CP dated June 15, 2026, detailing a number of articles of the Law on Construction concerning construction quality management, construction execution, and maintenance of construction works,” Jun. 15, 2026.
  2. Q. T. Nguyen, “Awareness of the role of construction supervision to ensure construction quality,” Construction Journal, no. 3, pp. 177–183, 2023.
  3. K. N. Jha and K. C. Iyer, “Critical factors affecting quality performance in construction projects,” Total Quality Management & Business Excellence, vol. 17, no. 9, pp. 1155–1170, 2006. DOI: 10.1080/14783360600750444.
  4. A. Enshassi, S. Mohamed, and S. Abushaban, “Factors affecting the performance of construction projects in the Gaza Strip,” Journal of Civil Engineering and Management, vol. 15, no. 3, pp. 269–280, 2009. DOI: 10.3846/1392-3730.2009.15.269-280.
  5. S. Wawak, Ž. Ljevo, and M. Vukomanović, “Understanding the key quality factors in construction projects—A systematic literature review,” Sustainability, vol. 12, no. 24, Art. no. 10376, 2020. DOI: 10.3390/su122410376.
  6. N. D. Long, S. Ogunlana, T. Quang, and K. C. Lam, “Large construction projects in developing countries: A case study from Vietnam,” International Journal of Project Management, vol. 22, no. 7, pp. 553–561, 2004. DOI: 10.1016/j.ijproman.2004.03.004.
  7. H. T. Tran, “Factors affecting cost and time of project completion in the construction phase: A case study in Can Tho City,” Can Tho University Journal of Science, Part D: Political Science, Economics and Law, no. 30, pp. 26–33, 2014.
  8. T. T. Nguyen, V. K. Tran, and N. P. Nguyen, “Study on factors affecting the quality of service life of irrigation works in the Mekong Delta in project life cycle,” Can Tho University Journal of Science, vol. 59, Special Issue: Engineering and Technology, pp. 261–268, 2023. DOI: 10.22144/ctu.jvn.2023.052.
  9. J. F. Hair, W. C. Black, B. J. Babin, R. E. Anderson, and R. L. Tatham, Multivariate Data Analysis, 6th ed. Upper Saddle River, NJ, USA: Pearson Prentice Hall, 2006.
  10. K. S. Shobana and D. Ambika, “Factors affecting quality in construction,” International Journal of Emerging Technology and Advanced Engineering, vol. 6, no. 9, pp. 145–150, 2016.