##common.pageHeaderLogo.altText##
JOURNAL OF MATERIALS & CONSTRUCTION

ISSN: 2734-9438

Website: www.jomc.vn

BIM-based quantity take-off and cost estimation in construction projects a case study of Vingroup

Le Minh Thoa

Abstract

Building Information Modeling (BIM) is increasingly used in construction to improve information management, multidisciplinary coordination, quantity take-off, cost estimation, and project control. However, effective BIM-based cost estimation requires not only 3D modeling but also standardized model information, naming conventions, appropriate Level of Development (LOD), data exchange, and integration between BIM elements and cost databases. This study examines BIM-based quantity take-off and cost estimation through a case study of Vingroup’s BIM Standard for Autodesk Revit. The analysis focuses on the BIM implementation framework, BIM Execution Plan (BEP), model development, multidisciplinary coordination, quantity surveying, 5D cost database, and cost-data linking. The findings show that the framework establishes an integrated process from BIM model development and quantity extraction to cost database development, cost-data linking, and Bill of Quantities (BOQ) generation. It also provides a foundation for improving consistency between design and cost information and supporting partial automation of cost estimation. Key requirements include standardized modeling, appropriate LOD, reliable cost databases, consistent information exchange, effective coordination, and clearly defined stakeholder responsibilities.

References

  1. Vingroup (2024), Vingroup BIM Standard for Autodesk Revit, Vietnam.
  2. S. Alathamneh, W. Collins, and S. Azhar (2024), “BIM-based quantity takeoff: Current state and future opportunities,” Automation in Construction, vol. 165, Art. no. 105549, 2024, doi: 10.1016/j.autcon.2024.105549.
  3. P. Pishdad and I. O. Onungwa (2024), “Analysis of 5D BIM for cost estimation, cost control and payments,” Journal of Information Technology in Construction (ITcon), vol. 29, pp. 525–548, 2024, doi: 10.36680/j.itcon.2024.024.
  4. M. Valinejadshoubi et al. (2024), “Automated system for high-accuracy quantity takeoff using BIM,” Automation in Construction.
  5. J. Cassandro, A. Farina, C. Mirarchi, and A. Pavan (2024), “Cost estimation practices: A comparative analysis of traditional 5D BIM and IFC methods,” in Proc. 41st Int. Conf. CIB W78, Marrakech, Morocco.
  6. M. Valinejadshoubi et al. (2025), “A cloud-driven framework for automated BIM quantity takeoff and quality control: Case study insights,” Buildings, vol. 15, no. 21, Art. no. 3942, 2025, doi: 10.3390/buildings15213942.
  7. W. Saenpaeng, S. Tantrairatn, and A. Chaphirom (2025), “Development of an automated workflow for reinforced concrete structural quantity takeoff and cost estimation using visual programming in a BIM environment,” Engineering and Technology Horizons, vol. 42, no. 4, 2025, doi: 10.55003/ETH.420402.
  8. A. Sanchez et al (2014), “BIM for Sustainable Whole-of-life Transport Infrastructure Asset Management” The Institute of Public Works Engineering Australasia (IPWEA), Australia, pp. 1-7, 2014.
  9. Eadie, R., et al. (2014), “Building information modelling adoption: an analysis of the barriers to implementation” Journal of Engineering and Architecture 2(1): 77-101.
  10. EU BIM Task Group (2017), Handbook for the introduction of Building Information Modelling by the European Public.
  11. Ahmed, S. (2018), “Barriers to implementation of building information modeling (BIM) to the construction industry: a review” Journal of Civil Engineering and Construction 7(2): 107-113.
  12. Alreshidi, E., et al. (2017), “Factors for effective BIM governance” Journal of Building Engineering 10: 89-101.
  13. Ashworth, S., et al. (2016), The role of FM in preparing a BIM strategy and employer’s information requirements (EIR) to align with client asset management strategy, EuroFM's 15th research symposium at EFMC2016. Milan, Italy: 218-228.
  14. BES-BIM (2019), “What is BIM?”. Retrieved 15 August 2020, from http://www.besbim.hu/what-is-bim.
  15. Chan, C. T. W. (2014), “Barriers of implementing BIM in construction industry from the designers’ perspective: A Hong Kong experience” Journal of System and Management Sciences 4(2): 24-40.
  16. M. Dixit et al. (2019), “Integration of facility management and building information modeling (BIM): A review of key issues and challenges”, Facilities, vol. 37, no. 08, pp. 455-483, Apr. 2019. doi.org/10.1108/F-03-2018-0043.
  17. R. Acquah et al. (2018), “Acceptance of Building Information Modelling: a survey of professionals in the construction industry in Ghana”, Electronic Journal of Information Technology in Construction, vol. 23, Apr. 2018.
  18. Amjed et al. (2019), “The Benefits of and Challenges to Implement 5D BIM in Construction Industry,” Civl Engineering Journal, vol. 5, no. 2, Feb. 2019.