##common.pageHeaderLogo.altText##
JOURNAL OF MATERIALS & CONSTRUCTION

ISSN: 2734-9438

Website: www.jomc.vn

How clearly do tender package titles describe BIM service scope? Evidence from Vietnam

Nguyen The Quan , Dao Thuy Ninh

Abstract

Tender package titles provide an initial indication of the services being procured. However, little is known about how explicitly these titles describe BIM-related work in Vietnam. This study examines 752 tender package titles retrieved from Vietnam’s National E-Procurement System through two keyword searches that initially returned 1,308 records. Using content analysis, we coded each title against four dimensions: BIM action, work object, project stage, and the relationship between BIM and other package tasks. The proportions reaching Level 2 were 75.93%, 70.48%, 20.48%, and 94.55%, respectively. The most common configuration (2–2–1–2) accounted for 55.72% of the sample, while 13.43% reached Level 2 across all four dimensions. Although only 20.48% of titles explicitly linked BIM to a project stage, a further 77.26% allowed the stage to be inferred from the principal task. Excluding five borderline eligibility cases changed the Level 2 proportions by no more than 0.14 percentage points. The findings reveal differences in how directly BIM service information is expressed across the four dimensions. They also provide a basis for identifying which elements of a package title could be clarified, provided that any revision reflects the actual service scope. The results describe textual specificity within the retrieved sample rather than readers’ understanding or procurement performance.

References

  1. H. B. Cavka, S. Staub-French, and E. A. Poirier, “Developing owner information requirements for BIM-enabled project delivery and asset management,” Automation in Construction, vol. 83, pp. 169–183, 2017, doi: 10.1016/j.autcon.2017.08.006.
  2. B. C. Matos, C. O. Cruz, and F. B. Branco, “Digitalization and procurement in construction projects: An integrated BIM-based approach,” Journal of Information Technology in Construction, vol. 29, pp. 400–423, 2024, doi: 10.36680/j.itcon.2024.019.
  3. A. Pérez-García, N. Martín-Dorta, and J. Á. Aranda, “BIM requirements in the Spanish public tender—Analysis of adoption in construction contracts,” Buildings, vol. 11, no. 12, Art. no. 594, 2021, doi: 10.3390/buildings11120594.
  4. A. Pérez-García, N. Martín-Dorta, and J. Á. Aranda, “Enhancing BIM implementation in Spanish public procurement: A framework approach,” Heliyon, vol. 10, no. 9, Art. no. e30650, 2024, doi: 10.1016/j.heliyon.2024.e30650.
  5. National Assembly of Vietnam, “Law on Construction,” Law No. 135/2025/QH15, Dec. 10, 2025. [Online]. Available: https://chinhphu.vn/?pageid=27160&docid=216514&classid=1&typegroupid=3. [Accessed: Oct. 15, 2026] (in Vietnamese).
  6. Government of Vietnam, “Decree detailing a number of articles of the Law on Construction on the management of construction activities,” Decree No. 217/2026/ND-CP, Jun. 19, 2026. [Online]. Available: https://vanban.chinhphu.vn/?pageid=27160&docid=218509. [Accessed: Oct. 15, 2026] (in Vietnamese).
  7. A. Tomczak, L. van Berlo, T. Krijnen, A. Borrmann, and M. Bolpagni, “A review of methods to specify information requirements in digital construction projects,” IOP Conference Series: Earth and Environmental Science, vol. 1101, no. 9, Art. no. 092024, 2022, doi: 10.1088/1755-1315/1101/9/092024.
  8. S. Fischer, H. Urban, C. Schranz, and G. Zucker, “Bridging the gap between tabular information requirements and the Information Delivery Specification (IDS),” Buildings, vol. 15, no. 7, Art. no. 1017, 2025, doi: 10.3390/buildings15071017.
  9. T.-Q. Nguyen, T.-T. Thieu-Thi, and N.-N. Vu, “BIM-based competitive advantages and competitive strategies for construction consultancy SMEs: A case study in Vietnam,” International Journal of Sustainable Construction Engineering and Technology, vol. 12, no. 3, pp. 1–11, 2021, doi: 10.30880/ijscet.2021.12.03.001.
  10. L. Q. Phuong and N. T. Quan, “Proposed rules for developing BIM models to automate quantity take-off in state-funded construction projects in Vietnam,” Journal of Science and Technology in Civil Engineering, vol. 14, no. 4V, pp. 118–129, 2020, doi: 10.31814/stce.nuce2020-14(4V)-11 (in Vietnamese).
  11. T.-N. Dao, T.-Q. Nguyen, and P.-H. Chen, “BIM adoption in construction projects funded with state-managed capital in Vietnam: Legal issues and proposed solutions,” in CIGOS 2019, Innovation for Sustainable Infrastructure, vol. 54. Singapore: Springer, 2020, pp. 1211–1216, doi: 10.1007/978-981-15-0802-8_194.
  12. D. P. Nguyen and T. N. Dao, “Construction contracts in BIM-enabled construction investment projects: International experience and practice in Vietnam,” Journal of Science and Technology in Civil Engineering, vol. 12, no. 1, pp. 29–35, 2018, doi: 10.31814/stce.nuce2018-12(1)-04 (in Vietnamese).
  13. T.-N. Dao, P.-H. Chen, and T.-Q. Nguyen, “Critical success factors and a contractual framework for construction projects adopting building information modeling in Vietnam,” International Journal of Civil Engineering, vol. 19, no. 1, pp. 85–102, 2021, doi: 10.1007/s40999-020-00542-3.
  14. T.-Q. Nguyen, N.-A. Dau-Thi, and T.-N. Dao, “Human resources for BIM jobs in the AEC industry in Vietnam: An investigation on job positions and requirements,” IOP Conference Series: Materials Science and Engineering, vol. 945, no. 1, Art. no. 012037, 2020, doi: 10.1088/1757-899X/945/1/012037.
  15. T.-N. Dao, P.-H. Chen, and T.-Q. Nguyen, “Enhancement of mutual recognition and mobility of BIM experts in ASEAN countries,” Sustainability, vol. 12, no. 18, Art. no. 7368, 2020, doi: 10.3390/su12187368.
  16. Q. Tran and A. T. Nguyen, “Developing an information management process for BIM-enabled projects based on ISO 19650 and Vietnam’s construction legal framework,” Journal of Materials and Construction, vol. 14, no. 02, pp. 140–147, 2024, doi: 10.54772/jomc.02.2024.634 (in Vietnamese).
  17. D. H. Nguyen and T. K. L. Ngo, “A proposed process for transitioning from traditional project management to BIM adoption in construction firms: A case study of TTCL Vietnam,” Journal of Materials and Construction, vol. 16, no. 03, pp. 131–136, 2026, doi: 10.54772/jomc.03.2026.1282 (in Vietnamese).
  18. K.-J. Park and J.-H. Ock, “Structuring a BIM service scoping, tendering, executing, and wrapping-up (STEW) guide for public owners,” Applied Sciences, vol. 12, no. 7, Art. no. 3275, 2022, doi: 10.3390/app12073275.
  19. UK BIM Framework, Information Management According to BS EN ISO 19650—Guidance Part E: Tendering and Appointments, 2021. [Online]. Available: https://www.ukbimframework.org/wp-content/uploads/2021/02/Guidance-Part-E_Tendering-and-appointments_Edition-2.pdf. [Accessed: Oct. 15, 2026].
  20. E. Mitera-Kiełbasa and K. Zima, “Automated classification of exchange information requirements for construction projects using Word2Vec and SVM,” Infrastructures, vol. 9, no. 11, Art. no. 194, 2024, doi: 10.3390/infrastructures9110194.
  21. K. A. Neuendorf, The Content Analysis Guidebook, 2nd ed. Thousand Oaks, CA: SAGE Publications, 2017, doi: 10.4135/9781071873045.
  22. K. Krippendorff, Content Analysis: An Introduction to Its Methodology, 4th ed. Thousand Oaks, CA: SAGE Publications, 2018.
  23. R. Bijker, S. S. Merkouris, N. A. Dowling, and S. N. Rodda, “ChatGPT for automated qualitative research: Content analysis,” Journal of Medical Internet Research, vol. 26, Art. no. e59050, 2024, doi: 10.2196/59050.
  24. C. O’Connor and H. Joffe, “Intercoder reliability in qualitative research: Debates and practical guidelines,” International Journal of Qualitative Methods, vol. 19, pp. 1–13, 2020, doi: 10.1177/1609406919899220.
  25. M. Wrzosek, T. Owerko, M. Rochel, and D. Kasznia, “Automating compliance: Advanced verification techniques for information requirements in BIM railway projects,” Geomatics and Environmental Engineering, vol. 19, no. 3, pp. 63–89, 2025, doi: 10.7494/geom.2025.19.3.63.