Factors influencing cost overruns in publicly funded hospital projects

Nhat Minh Huynh , Long Le Hoai , Tho Nguyen Huu

Abstract

In the context of Vietnam's strong economic development and increasing demand for healthcare, enhancing healthcare infrastructure and addressing the issue of overcrowding in public hospitals has become a crucial government objective. This study focuses on identifying the factors influencing cost escalation in public hospital construction projects funded by public investment. The research applies a non-probability sampling method, using convenient sampling and Referral/Snowball sampling techniques. A total of 120 individuals participated in the study, including investors, project managers, design and construction contractors, subcontractors, and relevant suppliers. The study's findings have identified and ranked the ten most significant factors affecting cost escalation in public hospital projects. These factors include inadequate functional design, inadequate functional design, delay in disbursing public investment capital, unforeseeable events, design errors leading to repetitive construction, impact of exchange rate fluctuations on imported medical equipment, unfavorable weather conditions during construction, delay in providing adjusted contract prices or approving adjusted investment amounts, complex geological conditions, and use of estimated quantity estimates in bidding when design is incomplete. The results of this research contribute significantly to the management of construction costs in public hospitals, particularly in the context of public investment funding.

References

  1. . (2013). Quyết định số 122/QĐ - TTg của Thủ tướng Chính phủ: Phê duyệt Chiến lược quốc gia bảo vệ, chăm sóc và nâng cao sức khỏe nhân dân giai đoạn 2011 - 2020, tầm nhìn đến năm 2030. [Online] Available: https://chinhphu.vn/default.aspx?pageid=27160&docid=165437
  2. . (2020). Quyết định số 648/QĐ-TTg của Thủ tướng Chính phủ: Phê duyệt nhiệm vụ lập quy hoạch mạng lưới cơ sở y tế thời kỳ 2021 - 2030, tầm nhìn đến năm 2045. [Online] Available:
  3. https://vanban.chinhphu.vn/default.aspx?pageid=27160&docid=200040
  4. . S.-Y. Kim, K. N. Tuan, J. D. Lee, H. Pham, and V. T. Luu, "Cost overrun factor analysis for hospital projects in Vietnam," KSCE Journal of Civil Engineering, vol. 22, pp. 1-11, 2018. [Online]. Available: https://link.springer.com/article/10.1007/s12205-017-0947-5.
  5. . N. T. N. Nam, "Đánh giá tương quan phát sinh và hạn chế tranh chấp trong xây dựng trường hợp nghiên cứu tại Việt Nam," Luận văn thạc sĩ tại trường Đại học Bách Khoa, Đại học Quốc Gia TP.HCM, 2019.
  6. . A. Balali, R. C. Moehler, and A. Valipour, "Ranking cost overrun factors in the mega hospital construction projects using Delphi-SWARA method: An Iranian case study," International Journal of Construction Management, vol. 22, no. 13, pp. 2577-2585, 2022. [Online]. Available:
  7. https://www.tandfonline.com/doi/abs/10.1080/15623599.2020.1811465.
  8. . A. De Marco, G. Mangano, A. Corinna Cagliano, and S. Grimaldi, "Public financing into build-operate-transfer hospital projects in Italy," Journal of Construction Engineering and Management, vol. 138, no. 11, pp. 1294-1302, 2012. [Online]. Available:
  9. https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000545.
  10. . R. O. Asiedu and E. Adaku, "Cost overruns of public sector construction projects: a developing country perspective," International Journal of Managing Projects in Business, vol. 13, no. 1, pp. 66-84, 2020. [Online]. Available: https://www.emerald.com/insight/content/doi/10.1108/IJMPB-09-2018-0177/full/html.
  11. . L. M. Lộc, "Phân tích rủi ro tàu chính dự án xây dựng bệnh viện: Nghiên cứu bệnh viện cấp cứu thành phố Bảo Lộc, tỉnh Lâm Đồng," Luận văn thạc sĩ tại trường Đại học Bách Khoa, Đại học Quốc Gia TP.HCM, 2018.
  12. . I. A. Rahman, A. H. Memon, A. A. A. Aziz, and N. H. Abdullah, "Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective," Research Journal of Applied Sciences, Engineering and Technology, vol. 5, no. 06, pp. 1963-1972, 2013. [Online]. Available: https://repository.bakrie.ac.id/136/.
  13. . Y.-M. Cheng, "An exploration into cost-influencing factors on construction projects," International Journal of Project Management, vol. 32, no. 5, pp. 850-860, 2014. [Online]. Available:
  14. https://www.sciencedirect.com/science/article/abs/pii/S0263786313001348.
  15. . I. R. Endut, A. Akintoye, and J. Kelly, "Cost and time overruns of projects in Malaysia," retrieved on August, vol. 21, pp. 243-252, 2009.